Municipal
Rosary Hall Library, Albertus Magnus College -
Engineering Design for new air conditioning for 20,000 SF library with 3-stories
Edward Smith Library -
Install and configure library network equipment and infrastructure
Magnus Wahlstrom Library, University of Bridgeport -
Renovation of executive offices and first floor of a 20,000 SF facility

Old Lyme, CT Town Hall
-
Feasibility Study and MEP/FP design for the renovation of approximately 11,500 SF existing and addition of approximately 5,500 SF
-
Emergency generator design
-
Commercial Photovoltaic Energy Storage system design
Weston Town Hall, Weston, CT

The work included the following:
-
Design of a fire alarm system at the town hall complex which includes the Town Hall, Police Department, Emergency Services and Fire Department
-
Field survey and feasibility study of the existing facility to determine the conditions of the existing fire alarm systems
-
Prepared demolition plans showing the approximate layout of the existing fire alarm systems
-
Prepared plans and specifications for the installation of the electrical system
-
Design of fire alarm system to meet the specific code requirements designed around Edwards Systems Technology fire alarm equipment as requested
-
Provided construction administration services including shop drawing review, equipment submittals and punch list